Roads, Streets, Bridges, Dams and Drainage

Demolition and replacement of the pavement, curb, sidewalk, storm drain, base, and sub-base of East Pioneer Street. The Consultant shall conduct design, public meetings, develop traffic control plans, provide information, reports, and drawings necessary to develop and communicate the project program, education specifications, concept...

Proposed station improvements include general concrete platform demolition while protecting existing canopy/foundations and; construction of new thickened concrete platform with tactile pavers and trench drain; new platform/track under drainage; new sidewalks, curbs and gutters; new accessible ramps and stairs; new guardrail and handrail; selective parking...

Project Scope • Environmental Impact Statement (EIS) including alternative selection, alignment selection, public outreach, and agency coordination. • Acquire right-of-way sufficient to build the necessary improvements. • Increase the capacity of the intersection to Policy Level of Service (LOS) "E" without degrading LOS at...

Project Description & Purpose ? Environmental Impact Statement (EIS) including alternative selection,preliminary engineering, public outreach, agency coordination,environmental analysis, and documentation. ? Conversion of approximately six miles of existing Pyramid Highway (SR 445) from an arterial to a controlled access freeway. ? Development of new controlled access freeway from US 395 to Pyramid Highway...