Roads, Streets, Bridges, Dams and Drainage

Remove the existing shoulder surface treatment and replace with a new Black Demarcation Shoulder Treatment in Segments 1 from Forest Park Blvd. to Dirks Rd./Altamesa Blvd. Remove prefabricated pavement markings and replace with new All-Weather Patterned Thermoplastic Solid Pavement Markings."Please see bid link for more...

The work to be performed under this contract includes asphalt pavement milling, asphalt pavement removal, new asphalt overlay, replacement of existing lighting and signs, installation of new taxiway lighting, application of new paint markings, topsoiling and seeding."Please see bid link for more information"http://www.arlingtonwa.gov/DocumentCenter/View/3791/AWO---Airport-Bid-4-17-2020...

This project generally includes new pavement construction and ADA improvements at Runyon Preserve, as well as pavement patching and overlay, and parking configuration improvements at the Operations and Law Enforcement Facility."Please see bid link for more information"https://www.reconnectwithnature.org/about-us/bids-and-rfp/annual-asphalt-repair-and-replacement...

This project generally includes preventative maintenance actions on various forest preserve parking lots and trails across our preserve system, which involves crack sealing, seal coating, and re-striping of preserve parking lots and trails."Please see bid link for more information"https://www.reconnectwithnature.org/about-us/bids-and-rfp/annual-asphalt-crack-seal-seal-coating...