Road, Sidewalk and Drainage

The project involves the removal of two existing 72" CMP culverts and replacing them by constructing a pre-fabricated 19' precast concrete span bridge with parapet rail, as detailed in the plans. Project includes excavation and embankment of existing soils, construction of structural concrete bridge abutments,...